Metro from South Extension → Pulbangash

View Map
Full network map
Fare
₹43
time
47 mins
Interchange
2
SOUTH EXTENSION
Pink Line Platform 2
Towards YAMUNA VIHAR
DILLI HAAT - INA
Change here
Move up towards Yellow Line
DILLI HAAT - INA
Yellow Line Platform 2
Towards SAMAYPUR BADLI
KASHMERE GATE
Change here
Move down towards Red Line
KASHMERE GATE
Red Line Platform 3
Towards RITHALA
PULBANGASH
Exit station • Automated AFC gates
Arr: 12:36:27

PULBANGASH

1 gates
Gate No. 1
Towards Roshanara Road ♿

SOUTH EXTENSION

4 gates
Gate No. 1
South Extention 1
Gate No. 2
South Extention 1 ♿
Gate No. 3
South Extention 2
Gate No. 4
South Extention 2 ♿

How to get from South Extension to Pulbangash by metro

Fare
₹43
Travel time
48 min
Stations
14
Changes
2

The metro gets you from South Extension to Pulbangash in about 48 min, passing 14 stations on the Pink Line, Yellow Line and Red Line. You change trains 2 times along the way. A token costs ₹43.

Your journey, step by step

  1. At South Extension, take the Pink Line from platform 2 towards Yamuna Vihar. Ride 1 stop and get off at Dilli Haat - INA.
  2. At Dilli Haat - INA, switch to the Yellow Line from platform 2 towards Samaypur Badli. Ride 10 stops and get off at Kashmere Gate.
  3. At Kashmere Gate, switch to the Red Line from platform 3 towards Rithala. Ride 2 stops and get off at Pulbangash.

Tickets and fare

A one-way token costs ₹43. Pay with a DMRC smart card and about ₹39 is deducted, 10% less, with a further 10% off on working days outside peak hours (before 8 AM, 12 to 5 PM, and after 9 PM). Sundays and national holidays are cheaper, and whatever the gate deducts is the fare that applies.

When to travel

Services from South Extension usually begin between 5:30 and 6:00 AM, and the last trains leave between 11:00 and 11:30 PM. Expect a train every 2 to 4 minutes in the rush hours (8:30 to 11 AM and 5:30 to 8:30 PM) and every 5 to 8 minutes the rest of the day. Travelling late? Confirm the last train time at the station.

Good to know

  • Match the 'towards' station above with the platform signs so you board in the right direction.
  • Changing lines at Dilli Haat - INA, Kashmere Gate involves a walk between platforms, so allow a few extra minutes at busy times.
  • Check the gate list for Pulbangash before you tap out, so you exit on the right side of the road.

About the two stations

SOUTH EXTENSION

SOEN
Station kind Regular station
Lines here
LN7
Parking No
Lift / step-free Available
On-site facilities
🏥 First Aid 🎫 TVM Ticketing 🚻 Restrooms ✓ Travel 🛗 Lifts & Escalators 🅿️ Parking Lot

PULBANGASH

PBGH
Station kind Regular station
Lines here
LN1
Parking Yes, 2 & 4 wheelers
Lift / step-free Available
On-site facilities
🏥 First Aid 🚻 Restrooms 💊 Pharmacy 🏧 ATM 🛗 Lifts & Escalators 🅿️ Parking Lot

Places near Pulbangash

Kishan Ganj Railway Station Mutiny Memorial Bara Hindu Rao Police Station Roshanara Garden Sadar Bazar Hindu Rao Hospital Rani Jhansi Road Fire Station Azad Market

Where this information comes from

The route, fare and platform details for South Extension to Pulbangash come from DMRC's public information (NMRC's for the Aqua Line). DelhiMetroSearch is an independent site, so treat station signs and announcements as final.

South Extension to Pulbangash: your questions answered

How much is a metro ticket from South Extension to Pulbangash? +

A token costs ₹43. With a smart card about ₹39 is deducted, and off-peak card trips get a further discount.

Which train do I board at South Extension? +

Take the Pink Line towards Yamuna Vihar, from platform 2.

Will I have to change trains? +

Yes, 2 times: at Dilli Haat - INA, Kashmere Gate.

How long is the ride, and how many stations? +

About 48 min, covering 14 stations.

When do the first and last trains run? +

First trains usually run from 5:30–6:00 AM and the last ones leave around 11:00–11:30 PM.

Which exit should I take at Pulbangash? +

The gates card above lists the roads and places next to each gate at Pulbangash, and marks the ones with lifts.